A draft of the 2045 Metropolitan Transportation Plan is now available for public review. The public comment period runs from August 10 through September 9. Email comments through the Contact Us tab on the website or to asussman@bhinc.com
Participate
Public participation for the 2045 MTP took place through a combination of in-person meetings and online input opportunities. The dates, locations, and presentation materials used during these meetings can be found below. Additional opportunities for participate included an online interactive map and a questionnaire, the results of which can also be seen below.
Recent Events
Update to the Technical Committee on May 20, 2020
Materials from Virtual Open House – August 13, 2020
Update to the Policy Committee – August 27, 2020
Public Meeting Phases
Public participation took place in three progressive phases through public meetings and focus groups.
Phase 1 introduced and provided an overview of the MTP, and gathered input from the public on general ideas, transportation needs, and challenges facing the system. The locations and times of the events are listed below:
Date
10.17.19
10.17.19
10.17.19
10.18.19
10.18.19
Time
11 AM – 2 PM
11:30 AM – 2:30 PM
4:30 PM – 6:30 PM
9 AM – 12 PM
9 AM – 12 PM
Location
Aztec Public Library
Kirtland Youth Association Building
Downtown Farmington Makers Market
Bloomfield Multi-Cultural Center
Animas Trail – Berg Park
Phase 2 reviewed draft goals and objectives, review transportation analysis performed by the project team, and confirm transportation priorities.
Phase 3 provided opportunity for a final review of the draft MTP, including the proposed project lists.
Questionnaire
Results coming soon.
Interactive Map
Results coming soon.