Menu
  • Home
  • Our Services
    • Water Resources and Systems
    • Traffic and Transportation
    • Community Development and Planning
    • Structures
    • Surveying
    • Spatial Data
    • Planning
    • Field and Materials Testing Laboratory
    • Aviation
    • Construction Engineering Services
    • EnvsionIT Solutions
    • Close
  • Who We Are
    • Leadership
    • History
    • Mission, Vision and Values
    • Quality Focus
    • Sustainability
    • Giving Back
    • Close
  • Markets We Serve
    • Traffic and Transportation
    • Energy and Power
    • Planning
    • Education
    • Public Infrastructure
    • Design-Build
    • Native Nations
    • Private Development
    • Healthcare
    • Water
    • Aviation
    • Close
  • Project Gallery
  • Media
    • Contacts
    • News Room
    • Marketing Materials
    • Close
  • Careers
    • Employment Listings
    • BHI Benefits
    • For College Students
    • Why Choose BHI
    • Ethical Practices at BHI
    • Commitment to Diversity
    • Commitment to the Environment
    • Close
  • BHITracker
    • Bids
    • Projects
    • Close

Bohannan Huston, Inc.

    • Close
  • Contact Us

Westerly Creek OSP

Mobile Menu
  • Project Summary
  • Project Sponsors
  • Manager Contact Info
  • Project Team
  • Project Meetings
  • Project Info
  • FAQ
  • Photos

Project Summary:

The Mile High Flood District, City and County of Denver, and City of Aurora have entered an agreement to conduct outfall systems planning for Westerly Creek downstream of Westerly Creek Dam.

Goals for the OSP are looking for opportunities to daylight waterways, improve capacity, and reduce street flooding to meet local criteria.

Phase 1 (Baseline Hydrology) – BHI is performing all data gathering and analysis to prepare the baseline hydrology portion of the master plan report. Phase 2 (Alternatives Analysis) – BHI is performing all analyses needed to prepare the alternatives analysis portion of the master plan report. Phase 3 (Conceptual Design) – BHI is preparing a conceptual design based on the specific plan selected by the District and Project Sponsors.

BHI is submitting a written report titled “Westerly Creek Downstream of Westerly Dam Outfall Systems Plan” designed in a way that will allow future updates to be easily made to the reporting, tables, and mapping.

^ Back to top

Project Sponsors:

MHFD-logo
DLogo-Prmary
aurora-logo2

^ Back to top

Project Manager Contact Information:

Rifka Wine , P.E., CFM
Project Manager
Bohannan Huston Inc.
Meridian One 9785 Maroon Circle, Suite 140
Englewood CO, 80112
Phone: 303-799-5103
rwine@bhinc.com
www.bhinc.com

Mark Schutte
Project Engineer
Mile High Flood District
2480 W. 26th Ave. Suite 156-B
Denver, CO 80211
Office: 303-455-6277
Direct: 720-642-7332
mhfd.org
mschutte@mhfd.org

Chris Best
Senior Engineer
City & County of Denver
Department of Transportation & Infrastructure
Infrastructure Build – Wastewater
Phone: 303-446-3638
Chris.Best@denvergov.org

Sarah “Sam” Miller, EIT
Engineer
City of Aurora
Aurora Water
Phone: 303-739-7368
samiller@auroragov.org

^ Back to top

Project Team:

NameOrganizationProject Role
Mark SchutteMHFDProject Manager
Morgan LynchMHFDWatershed Manager
Sam MillerCity of AuroraLocal Sponsor
Chris BestCity and County of DenverLocal Sponsor
Craig HooverBohannan Huston, Inc.Principal-in-Charge
Rifka WineBohannan Huston, Inc.Project Manager
Casey BangsBohannan Huston, Inc.Project Engineer

^ Back to top

Project Meetings:

Kickoff was held November 23, 2020 on Microsoft Teams.

^ Back to top

Project Information:

Project Goals:

The ultimate goal is to complete OSP for the Westerly Creek area downstream of Westerly Creek Dam to:

  • Evaluate existing studies and be mindful of their original intent
  • Identify drainage system deficiencies, specifically where flooding is in excess of 1 ft
  • Identify and plan upgrades to the existing stormwater system facilities and propose new improvements including new conveyances, including the addition of surface flow where possible (daylight)
  • Develop improvement alternatives to meet the drainage/flooding criteria, including water quality
  • If open space is going to be evaluated for stormwater management, preserve or enhance existing or new open space
  • Conceptual design
  • Prioritize stormwater projects
  • Any efforts to daylight Westerly Creek in this area, include sections of trail along tributaries to the Creek.
  • Formalizing some of the previous studies, improve water quality in dense, urbanized areas.

Public Outreach:

DeliverableDraft SubmittalFinal SubmittalPublic MeetingStatus
Baseline HydrologyTBDTBDTBDOn-going
Alternatives AnalysisTBDTBDTBDOn-going
Conceptual DesignTBDTBDTBDOn-going

Project Map:

^ Back to top

Frequently Asked Questions:

^ Back to top

Photos:

Coming soon…

^ Back to top

© 2020 Bohannan Huston, Inc. All rights reserved.

  • Welcome/Overview
  • Resources
  • Get Involved
  • Contact Us

Get In Touch

Albuquerque Headquarters


7500 Jefferson St. NE
Albuquerque, NM 87109

Phone: 505.823.1000

Email: Email us here

 

Las Cruces


2730 Northrise Drive
Las Cruces, NM 88011

Phone: 575.532.8670

Email: Email us here

 

Colorado


Denver

10303 E. Dry Creek Rd., Suite 250
Englewood, CO 80112

Phone: 303.799.5103

Email: Email us here


Grand Junction

700 Belford Avenue
Grand Junction, CO 81501

Phone: 970.788.1140

Email: Email us here

Logins


  • RFQ / DBE Portal
  • BHITracker

© Bohannan Huston, Inc. All rights reserved.

  • Home
  • Our Services
  • Who We Are
  • Markets We Serve
  • Project Gallery
  • Media
  • Careers
  • Contact Us
  • BHITracker Portal